The Long Lead EDC pocket knife from Boker Magnum is a good-looking, modern slip-joint knife. It has a blade made from 7Cr17MoV stainless steel and a black G-10 handle. The knife has a clean, up-class appearance and will slide comfortably into your pocket with the tip-down pocket clip, ready to join you on your next adventure.
Boker Magnum Long Lead EDC Slip Joint Knife -Satin Plain
$42.99 Original price was: $42.99.$30.09Current price is: $30.09.
SKU: Item #GX-36443 Categories: Folding Knives, Knives
- Worry-Free Shopping with Safe Payments
- Quality at its Finest
- 100% High Quality Guarantee
- Free and fast shipping worldwide

| Product Type: | Knife |
|---|---|
| Overall Length: | 7.125" |
| Blade Length: | 3.125" |
| Cutting Edge: | 3.00" |
| Blade Width: | 0.75" |
| Blade Thickness: | 0.73" |
| Blade Material: | 7Cr17MoV |
| Blade Style: | Spear Point |
| Blade Grind: | Flat |
| Finish: | Satin |
| Edge Type: | Plain |
| Handle Length: | 4.00" |
| Handle Width: | 0.75" |
| Handle Thickness: | 0.41" |
| Handle Material: | G-10 |
| Color: | Black |
| Frame/Liner: | Steel |
| Weight: | 2.70 oz. |
| User: | Right Hand |
| Pocket Clip: | Tip-Down |
| Knife Type: | Manual |
| Opener: | Nail Nick |
| Lock Type: | Slip Joint |
| Brand: | Boker |
| Model: | Long Lead EDC |
| Model Number: | 01SC080 |
| Country of Origin: | China |
| Best Use: | Everyday Carry |
Be the first to review “Boker Magnum Long Lead EDC Slip Joint Knife -Satin Plain” Cancel reply
Related products
Sale!
Automatic Knives
Sale!
Sale!
Sale!
Fixed Blade Knives
Sale!
Sale!
Fixed Blade Knives
Sale!
Automatic Knives
Sale!
Folding Knives

















Reviews
There are no reviews yet.